Current Legal Ads
There are no current bids.
Archived Legal Ads
2021
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: EAST NEWPORT DRIVE SLOPE FAILURE REMEDIATION
EAST NEWPORT DRIVE SLOPE FAILURE REMEDIATION PDF
EAST NEWPORT DRIVE SLOPE FAILURE REMEDIATION BID OPENING FORM PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: FELLOWS RIVERSIDE GARDENS OUTDOOR EDUCATION BUILDING
FELLOWS RIVERSIDE GARDENS OUTDOOR EDUCATION BUILDING PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: METROPARKS BIKEWAY IMPROVEMENTS
METROPARKS BIKEWAY IMPROVEMENTS PDF
METROPARKS BIKEWAY IMPROVEMENTS BID OPENING FORM PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: 2021 DRIVE IMPROVEMENTS
2021 DRIVE IMPROVEMENTS PDF
2021 DRIVE IMPROVEMENTS BID OPENING FORM PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: 2021 PARKING LOT IMPROVEMENTS
2021 PARKING LOT IMPROVEMENTS PDF
2021 PARKING LOT IMPROVEMENTS BID OPENING FORM PDF
2020
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: FELLOWS RIVERSIDE GARDENS OUTDOOR EDUCATION BUILDING
FELLOWS RIVERSIDE GARDENS OUTDOOR EDUCATION BUILDING PDF
BID OPENING FORM – FELLOWS RIVERSIDE GARDENS OUTDOOR EDUCATION BUILDING PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: FORD NATURE CENTER REDEVELOPMENT
FORD NATURE CENTER REDEVELOPMENT PDF
BID OPENING FORM – FORD NATURE CENTER REDEVELOPMENT PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: METROPARKS BIKEWAY IMPROVEMENTS
METROPARKS BIKEWAY IMPROVEMENTS PDF
METROPARKS BIKEWAYS IMPROVEMENTS PLAN SET
METROPARKS BIKEWAY CONTRACT DOCS
METROPARKS BIKEWAY BID OPENING FORM
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: MILL CREEK GOLF COURSE CART PATHS
MILL CREEK GOLF COURSE CART PATHS PDF
MILL CREEK GOLF COURSE CART PATHS PLAN SET
MILL CREEK GOLF COURSE CONTRACT DOCS
MILL CREEK GOLF COURSE BID OPENING FORM
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: 2020 PARKING LOT IMPROVEMENTS
2020 PARKING LOT IMPROVEMENTS PDF
2020 PARKING LOT IMPROVEMENTS PLAN SET
2020 PARKING LOT IMPROVEMENTS CONTRACT DOCUMENTS
2020 PARKING LOT IMPROVEMENTS BID FORM
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: WICK RECREATION AREA MAINTENANCE FACILITY
2019
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: METROPARKS FARM PARKING LOT IMPROVEMENTS
2018
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: IDORA BRIDGE IMPROVEMENTS
Legal Notice to Vendors
Notice is hereby given that requests for proposals to furnish all food and beverage vendor services and related materials and/or equipment for the following: MILL CREEK PARK – WICK RECREATION AREA, FOOD & BEVERAGE OPERATION
WICK RECREATION AREA FOOD AND BEVERAGE OPERATION PDF
Statement of Qualifications
Mill Creek MetroParks is requesting general statements of qualifications from consultants for professional services for 2018 and 2019. Professional services include but are not limited to land surveying, landscape architecture, engineering, architecture, geotechnical, archaeological and environmental restoration.
STATEMENT OF QUALIFICATIONS PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: 2018 Parking Lot Improvements
2018 PARKING LOT IMPROVEMENTS PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: Mill Creek Golf Course Bunker Restoration – North Course
MILL CREEK GOLF COURSE BUNKER RESTORATION – NORTH COURSE PDF
2017
Legal Notice
Notice is hereby given that sealed bids to furnish all materials and/or equipment for the following: MILL CREEK GOLF COURSE GOLF CART LEASE
MILL CREEK GOLF COURSE CART LEASE PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: MILL CREEK GOLF COURSE CART STAGING AREA
MILL CREEK GOLF COURSE CART STAGING AREA PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: MILL CREEK GOLF COURSE BUNKER RESTORATION – SOUTH COURSE
MILL CREEK GOLF COURSE BUNKER RESTORATION – SOUTH COURSE PDF
Request for Qualifications — Ford Nature Center Redevelopment
Mill Creek MetroParks is requesting Statements of Qualifications for professional consultant services, including architectural, landscape architectural, engineering and other necessary disciplines, to carry out professional review, analysis, assessment, design, site planning, cost estimating and preparation of construction drawings for the proposed redevelopment of the Ford Nature Center structures and site in Mill Creek Park.
FORD NATURE CENTER REDEVELOPMENT PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: MCP – PARKING LOT IMPROVEMENTS
MCP – PARKING LOT IMPROVEMENTS PDF
Legal Notice
Sealed bids to furnish all materials and/or equipment for: MILL CREEK GOLF COURSE GOLF MAINTENANCE EQUIPMENT
MILL CREEK GOLF COURSE MAINTENANCE EQUIPMENT PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: TENNIS & BASKETBALL COURT IMPROVEMENTS AT VOLNEY ROGERS FIELD
TENNIS & BASKETBALL COURT IMPROVEMENTS AT VOLNEY ROGERS FIELD PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: CONSTRUCTION OF WET PLAYGROUND AT WICK RECREATION AREA
CONSTRUCTION OF WET PLAYGROUND AT WICK RECREATION AREA PDF
Legal Notice
Notice is hereby given that sealed bids to furnish all materials and/or equipment will be received by for the following: MILL CREEK METROPARKS GASOLINE AND FUEL OIL.
MILL CREEK METROPARKS GASOLINE AND FUEL OIL PDF
Legal Notice
Notice is hereby given that sealed bids to furnish all materials and/or equipment will be received by for the following: MILL CREEK METROPARKS CHEMICALS AND FERTILIZERS.
MILL CREEK METROPARKS CHEMICALS AND FERTILIZERS PDF
2016
Sealed proposals to furnish all labor, materials and equipment for: MEMORIAL HILL DRIVE IMPROVEMENTS
MEMORIAL HILL DRIVE IMPROVEMENTS PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: RESURFACING OF MEMORIAL HILL DRIVE
RESURFACING OF MEMORIAL HILL DRIVE PDF
Legal Notice to Contractors
Sealed proposals to furnish all labor, materials and equipment for: RECONSTRUCTION OF LILY POND PARKING LOT
RECONSTRUCTION OF LILY POND PARKING LOT PDF
Statement of Qualifications
Mill Creek MetroParks is requesting general statements of qualifications from professional consultants for design services for the 2016 & 2017 time period. Professional design services include but are not limited to land surveying, landscape architecture, engineering, architecture, geo-technical, archaeological and environmental restoration.
STATEMENT QUALIFICATIONS PDF
5 Year Capital Improvement Schedule
View the 5 Year Capital Improvement Schedule for Mill Creek MetroParks.
Capital Improvement Projects Information
2022 Restoration of Trails in Mill Creek Park
- $175,000.00 cost estimate
- Project to be completed in Fall 2022
- Funded through a donation from the Beeghly Family and the Mill Creek MetroParks General Fund for. Capital Improvements
- West Newport Trail
- The West Newport Trail will be improved upon from the Lake Newport Wetlands parking lot to the Lake Newport Dam. Work will consist of necessary earthwork, installation of stormwater conduit, installation of aggregate trail surface, and miscellaneous related items.
- Restroom replacement at Newport Wetlands
Annual Road Improvements
- $625,000.00 cost estimate
- Funded through the Mill Creek MetroParks General Fund for Capital Improvements and the Ohio Parks Districts Roadwork Fund.
East Newport Drive Slope Failure Remediation
- A retaining wall approximately 200 feet in length will be constructed along E Newport Dr between the East Newport Boat Launch and the Daffodil Meadow. The wall will consist of steel beams placed in drilled shafts with precast concrete panels between each steel beam.
Drive Resurfacing
- The East Newport Drive resurfacing project is split into two phases and will be started after the retaining wall has been finished. The first phase being the resurfacing from Shields Road to Kreider’s Entrance on the southern end of the road. The second phase includes the portion from East Newport Drive to Kiwatha Drive at the north end of the road. Items of construction include pavement planning, placement of intermediate and surface courses of asphalt concrete, placing and compacting an aggregate shoulder, and placing pavement markings.
Ford Nature Center: Exhibit Construction and Redevelopment
- $3,500,000.00 cost estimate
- Funded through private philanthropy and the Mill Creek MetroParks General Fund for Capital Improvements.
- Expected timeline of up to 24 months to complete, anticipated reopening in Spring/Summer 2022.
- The renovation of the Ford Nature Center addresses for the needed upgrades that will allow for it to continue as the MetroParks’ primary resource for nature education. The upgrades will elevate the level of the visitor’s experience as well as increase opportunities for more hands-on educational experiences in the form of nature classrooms, learning labs, and exhibits. Renovations and additions will include the newly designed exhibit hall in the basement of the building as well as transforming the garage into an educational building.
- The exhibits to be constructed include aspects such as interpretive wall panels and murals, exhibit structures and enclosures, an interactive map table, mobile exhibit of tree bark identification, electro/mechanical operated features, video/audio features, and computer station for eBird activity. Connecting with nature exhibit topics will cover forests, creeks, wetlands, lakes, our eyes/their eyes, and animal homes. Other exhibit topics will include the house history, bird observation, and Volney Rogers.
Annual Parking Lot Improvements
Ford Nature Center Parking Lot & Wick Maintenance Facility Parking Lot
- $200,000.00 cost estimate
- Funded through the Mill Creek MetroParks General Fund for Capital Improvements
- Approximate start date of August 2021
- Located at the Ford Nature Center (FNC) parking lot on Old Furnace Road and the Wick Recreation Area Maintenance Facility parking lot on Bears Den Drive. The main aspect to these projects is the installation of new asphalt pavement overlays, new concrete walks and curbs, and new permeable pavers. The FNC component also includes a dedicated trail connection to the East Cohasset hike & bike trail.
Annual Trail Improvements
- $125,000.00 cost estimate
- Project to be completed in Summer 2021.
- Funded through the Mill Creek MetroParks General Fund for Capital Improvements
- MetroParks Bikeway Improvements
- Herbert Road to Kirk Road and Westbury Park Spur Trail will be improved upon. The main work to be done is comprised of cleaning and surface preparation, treatment of existing cracks, full-depth pavement repair, pavement planing, application of tack coat, installation of pavement reinforcement mesh, installation of asphalt overlay, and furnishing and placing topsoil and compacted aggregate along shoulders.
Wick Warming House Renovations
- $800,000.00 cost estimate
- Funded through the Mill Creek MetroParks General Fund for Capital Improvements
- Anticipated start date in 2021.
- Rehabilitation of the existing warming house into a public space with reservable rooms, restrooms, concessions, retail space, and office space. Located at Wick Recreation Area. Interior and exterior demolition, interior construction, site grading, site utilities, and concrete pavement will all be the main project components.
Outdoor Education Center Construction
Fellows Riverside Gardens Outdoor Education Building
- $400,000.00 cost estimate
- Funded through the Mill Creek MetroParks General Fund for Capital Improvements, Friends of Fellows Riverside Gardens, and Commercial InterTech Foundation.
- Completed by December 2021.
- Located at Fellows Riverside Gardens in Mill Creek Park. Construction of a new, multi-faceted outdoor education building will be the main attraction. Other work such as site grading, site utilities, excavation, embankment, storm drainage, and concrete pavement will be completed.
E. Park Hike & Bike Trail Development
- $170,000.00 cost estimate
- 80% ($136,000) funded by ODOT through the Transportation Alternates Program (TAP) funds and the remaining 20% ($34,000) will be provided by the MetroParks.
- Anticipated to begin in 2021
- Located in Mill Creek Park parallel to East Park Drive about 0.15-miles north of Canfield Road (US-62). Construction includes grading and excavation, placement of aggregate base, berming, seeding, and mulching.
- This project will complete the 0.5 mile East Park Hike & Bike Trail, as well as the 7-mile bike/pedestrian facility in Mill Creek Park between US-224 and the Ford Nature Center.
Old Orchard Bridge Improvements
- $150,000 cost estimate
- Funded through the Transportation Alternatives Program (TAP) with matching funds through the Mill Creek MetroParks
- Start date on August 23, 2021 with a project length of approximately sixty (60) days
- Old Orchard Bridge on Chestnut Hill Drive in Mill Creek Park will be closed for bridge and drive improvements. Work will inlcude replacement of the existing bridge and railing curb, waterproofing, new concrete sidewalk, resurfacing of the bridge deck and drive approaches, as well as related items of construction.
- Chestnut Hill Pavilion will be accessible from High Drive (near Scholl Recreation Area), but Chestnut Hill Drive from Canfield Road (US-62) to Chestnut Hill Pavilion will be closed to all vehicular and pedestrian traffic.
- The detour shall be Canfield Road, Bears Den Road, and High Drive.